Project Name: Wastewater Operation Project of the 48th Research Institute of China Electronics Technology Group Corporation
Project Overview: The scale of the project is 400m3/d
Project address: High-tech Zone, Changsha City, Hunan Province
Process route: The advanced lime-aluminum salt method is used to treat fluorine-containing wastewater. Add lime milk to the wastewater, adjust the pH to 6~7.5, then add aluminum sulfate or polyaluminum chloride to form aluminum hydroxide floc, kill the calcium fluoride crystal and fluoride ion in the water, and remove it after precipitation.
Operation: Safe operation 24 hours a day, wastewater discharge standards.
Copyright (C) shenzhen yue peng environmental protection technology co., LTD